Subprocess: Project Phase C
Purpose: During Phase C, the project completes the design that meets the detailed requirements and begins fabrication of test and flight article components, assemblies, and subsystems. These activities focus on preparing for the Critical Design Review (CDR) and the System Integration Review (SIR). This phase culminates in KDP D.
Organization: ORG
Task |
Purpose |
Suggested Roles |
Task Lead(s) |
Estimated Completion Date |
Actual Completion Date |
Documents |
|||||
---|---|---|---|---|---|---|---|---|---|---|---|
Document |
Instructions and Samples |
Document Lead(s) |
Estimated Completion Date |
Actual Completion Date |
Document Location(s) |
||||||
Administration |
The purpose of this task is to provide basic administrative subtasks such as user and document management. |
Phase C Manager, |
Document Library |
||||||||
Project Technical Products. |
The purpose of this task is to provide Technical products for the Flight Project. |
Phase C Manager, |
Missile System Pre-Launch Safety Package (Baseline) |
||||||||
Detailed Design Report (Baseline) |
|||||||||||
Operations Handbook (Preliminary) |
|||||||||||
Orbital Debris Assessment (Baseline) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Project Planning, Cost, and Schedule Products |
The purpose of this task is to provide Planning, Cost, and Schedule products for the Flight Project. |
Phase C Manager, |
Work Agreement for Next Phase (Baseline) |
||||||||
Cost Analysis Data Requirement (CADRe) (Update) |
|||||||||||
Range Safety Risk Management Plan. (Baseline) |
|||||||||||
Systems Decommissioning-Disposal Plan (Preliminary) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Key Decision Point (KDP) Readiness Products |
The purpose of this task is to provide Key Decision Point (KDP) Readiness products for the Flight Project. |
Phase C Manager, |
Standing Review Board Report (RB) (Final) |
||||||||
Project Manager Recommendation (includes response to SRB Report, as applicable) (Final) |
|||||||||||
CMC Recommendation (Final) |
|||||||||||
Program Manager Recommendation (Final) |
|||||||||||
MD-PMC Recommendations (for Category I Projects, only) (Final) |
|||||||||||
Governing PMC Recommendation (Final) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
NPR 7120.5D Project Plan-Control Plans |
The purpose of this task is to provide NPR 7120.5D Project Plan-Control Plans products for the Flight Project. |
Phase C Manager, |
Missions Operations Plan (Baseline) |
||||||||
Logistics Plan (Baseline) |
|||||||||||
Science Data Management Plan (Baseline) |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Review Packages |
The purpose of this task is to provide Review Packages products for the Flight Project. |
Phase C Manager, |
Key Decision Point (KDP) D Package |
||||||||
Critical Design Review (CDR) Package |
|||||||||||
Production Readiness Review (PRR) Package |
|||||||||||
Systems Integration Review (SIR) Package |
|||||||||||
Peer Review (MCR) Package |
|||||||||||
Subsystem Preliminary Design Review (PDR) Package |
|||||||||||
Subsystem Critical Design Review (CDR) Package |
|||||||||||
System Review (SR) Package |
|||||||||||
Reviews |
|||||||||||
Approvals |
|||||||||||
Analysis |
The purpose of this task is to generate reports from the data resulting from the subprocess. |
Phase C Manager, |
Administration Reports |
||||||||
Project Technical Reports |
|||||||||||
Project Planning, Cost, and Schedule Reports |
|||||||||||
Key Decision Point (KDP) Readiness Reports |
|||||||||||
NPR 7120.5D Project Plan-Control Plans Reports |
|||||||||||
Review Packages Reports |
|||||||||||
Reviews |
|||||||||||
Approvals |